build safe|live safe nyc.gov/buildings
NYC Green Roof Property Tax
Abatement Program Guide
Rev. January 2022
The design of a green roof must meet specific requirements to be eligible for property tax abatement.
For example, it must have a layer of vegetation covering 50% of the rooftop. Sedum, or drought
resistant, live plants, must be spaced to cover at least 80% of this planted layer. Plus, a New York State
licensed professional engineer (PE), New York State registered architect (RA), New York State
licensed, and registered landscape architect or horticulturist must prepare a four-year maintenance
plan.
BENEFITS
One-year Tax Abatement
Standard Abatement: $5.23 per square foot of green roof
Enhanced Tax Abatement: $15.00 per square foot of green roof
Maximum abatement: $200,000 (a tax abatement that exceeds the total tax liability for one year may
be applied within the succeeding five years)
REQUIRED ELEMENTS OF A GREEN ROOF TO QUALIFY FOR AN ABATEMENT
Include all of the following:
Construction of any of the green roof requirements must have begun on or after August 5, 2008
At least 50% of eligible roof space must be covered by the green roof
A vegetation layer, at least 80% of which must be covered by live plants such as sedum or
equally drought resistant and hardy plant species. The 80% coverage means spacing of plants in
a manner that will cover 80% of the layer by the end of the compliance period (the year the tax
abatement is granted.) A New York State licensed and registered architect, engineer, landscape
architect or a horticulturist with a degree or certificate from an accredited training institute, must
certify the vegetative layer.
A weatherproof and waterproof roofing membrane compliant with NYC Construction and Fire
Codes
A root barrier layer
A drainage layer designed so the drains can be inspected and cleaned
A filter or separation fabric
A growth medium including natural or simulated soil at least two inches in depth
If the depth of the growth medium is less than three inches, an independent water holding
layer that is designed to prevent the rapid drying of the growth medium is also required,
unless the green roof is certified not to need regular irrigation to maintain live plants.
Maintenance Plan that includes:
Semi-annual inspection
Plans for plant replacement
Monthly inspections of drains; free from debris
Maintenance of green roof for a minimum of 4 years after the tax abatement is granted
build safe|live safe 2 nyc.gov/buildings
NYC Green Roof Property Tax
Abatement Program Guide
Rev. January 2022
ENHANCED TAX ABATEMENT REQUIREMENTS
All of the above, and
Construction of any of the green roof requirements must have begun on or after July 1, 2019 and
concluded on or before June 30, 2024.
Growth medium must be at least four inches
The property must be located in a priority community district. Locate your community district at
https://communityprofiles.planning.nyc.gov/.
Borough
Priority Community District*
Bronx
1, 2, 3, 4, 5, 6, 11
Brooklyn
3, 4, 5, 8, 9, 16, 17
Manhattan
10
*As of August 2021. For the most updated list of priority community districts, visit the NYC Mayor’s
Office of Sustainability website at nyc.gov/sustainability.
PROPERTY TAX ABATEMENT FILING REQUIREMENTS
A NYS registered architect or licensed engineer must submit the application to the Department of
Buildings through eFiling at www.nyc.gov/dobefiling.
The architect or engineer must file with DOB a professionally certified Alteration Type 2
(ALT2) application selecting Directive 14 (D14) acceptance. The application for work related to
the green roof property tax abatement must be filed as a separate application from any related
New Building (NB) or Alteration application.
The ALT2 application must only include work related to the green roof system.
If the project requires an electrical work permit, the electrical application in DOB NOW: Build
must indicate S - Sustainable Energy Installs in the Work Description, Category of Work.
Select both of the following items on the PC1: Required Items Checklist Form for
professionally certified jobs
1. PTA3: Green Roof Tax Abatement Application and
2. PTA3: Tax Abatement Eligibility Approval
NOTE: Applications without these two items selected will not be approved for a property tax abatement.
Submit the completed Property Tax Abatement Application (PTA3) form at the same time as
a request for construction sign-off.
The form must indicate if the property is located in a priority community district and thereby
eligible for the Enhanced Tax Abatement.
The form must be signed and sealed by the architect or engineer as well as the property
owner.
The completed PTA3 Form must be received by DOB by March 15
th
in order to qualify for a
tax abatement to take effect on July 1
st
of the same calendar year.
NOTE: Use the PTA3 Form Instructions for assistance in completing the form.
build safe|live safe 3 nyc.gov/buildings
NYC Green Roof Property Tax
Abatement Program Guide
Rev. January 2022
DOB will review all documents and supporting information, and forward approved abatement
applications to the NYC Department of Finance (DOF). DOF will review and, if appropriate,
apply the requested tax abatement.
CONSTRUCTION DRAWINGS & DOCUMENTS**
The following information, prepared by an architect or engineer, must be included on construction
drawings submitted to DOB for the installation of a green roof system.
Plot Plan that indicates the location of the building on the lot, as well as front, side and rear yard
dimensions, and include the Community District in which the property is located
Roof Plan that indicates eligible roof space and green roof space with the net square footage of
each, and location of rooftop equipment demonstrating access is provided for maintenance.
Demonstrate or acknowledge that the installation does not obstruct firefighting access if
applicable.
Structural Analysis that demonstrates the roof is capable of sustaining the added loads imparted
by the green roof in a saturated condition.
Where the green roof is designed for live loads equal to or less than 20 psf as per BC section
1607.11.2.3 of the 2008 NYC Building Code a note stating the following should be present on
drawings: “The green roof and its perimeter are not for human occupancy.”
Where a green roof is designed for live loads in accordance with table 1607.1 and section
1607.11.2.2 of the 2008 NYC Building Code, which- ever is greater, the note need not be
present on design drawings.
Roof Details
Details should be adequate to depict the construction of the roof. Where applicable details should
include, but not be limited to:
Details showing any structural modification to support the green roof
Details showing typical structural connections
Details showing typical roof drains; and
Typical roof system, insulation and flashing details.
Green Roof Details
Details of the installation showing conditions at terminations, transitions and penetrations
Layout for the internal drain conduit
A profiled schematic showing the thickness of all materials; and
Notes that include the species of vegetation (sedum or equally drought resistant species)
planted and acknowledging live plants will cover eighty percent of the vegetation layer by the
end of the compliance period.
**NOTE: Construction drawings are not required for green roofs of 4 inches or less. When construction
drawings are not required, the application must still be filed by a NYS registered and licensed architect or
engineer. In such cases, an architect or engineer must inspect and certify, based on a structural analysis of
the existing building, that the roof without modification can support the green roof in a saturated condition.
.
build safe|live safe 4 nyc.gov/buildings
NYC Green Roof Property Tax
Abatement Program Guide
Rev. January 2022
POST-APPROVAL, CONTINUING REQUIREMENTS
Maintenance of the green roof during compliance period.
Within fifteen (15) calendar days prior to the last day of the compliance period (the year the tax
abatement is granted), an inspection of the green roof must be performed by an architect,
engineer or landscape architect to certify its continuing compliance. An inspection report must be
prepared by the inspecting professional and maintained on file for review by DOB upon request. If
the green roof is not in compliance, the inspecting professional must notify DOB by email at
greenroofandso[email protected].gov.
ADDITIONAL INFORMATION
For additional information on the Green Roof Tax Abatement Program, please review:
Department’s Green Roof page for information about the Green Roof Tax Abatement Program
New York State Real Property Tax Law §§499-bbb
1 RCNY 105-01
For assistance with Green Roof & Solar Electric Tax Abatements, please email
greenroofandso[email protected].gov.